Official announce said taking out used fuel rods from No.4 unit pool within two years. But the 4 unit is leaning and having water leakage and pool falling down possibility with strong earthquake.
This method safer and quicker operation due to stable trolly movement on the bridge than huge cantilever type jib crane which has big deflection.